IT认证考试网

设为首页

收藏本站

首页 >> IT认证考试网 >> ibm认证考试 >> 正文

IBM 000-180 考试题库

·上一篇文章:   &  ·下一篇文章:

来源:   点击数:     录入时间:07-05-18 16:03:25

1.A customer purchased a p5 570 with no plans to partition.  The customer plans to use the ASMI interface to power on and off the machine.  How can ASMI be accessed without a HMC?
 
A: By typing diags and then going to the ASMI menus
B: Through SSH from a TCP/IP connection on the server
C: Through WebSM which is connected to a system Ethernet port
D: By connecting through a web browser to an HMC Ethernet port
Correct Answers:  D
 
2.A customer has seven days of vmstat data on four p5 590 production LPARs of four processors each.  The data shows that all four LPARs have periodic utilizations of 90-95% lasting several minutes in duration.  However, the average utilizations of the four LPARs were between 15-30%.  The vmstat data shows that the peak utilizations of each LPAR do not occur at the same time.  Which of the following should be set up?
 
A: A shared pool with four capped LPARs
B: A shared pool with four uncapped LPARs
C: Four dedicated LPARs and use DLPAR to manage resources effectively
D: The server in SMP mode and use WLM to manage resources effectively
Correct Answers:  B
 
3.A customer will be using Virtual IO Server to share Ethernet adapters.  What can be done to prevent network failure of the client if a Virtual IO Server goes down?
 
A: Create two virtual adapters on the client, each one from a separate Virtual IO Server
B: Enable dead gateway detection on the client so that the network traffic can be rerouted
C: Have a spare network card on standby in the client in case the Virtual IO Server goes down
D: Create an etherchannel adapter on the client using one Virtual Ethernet adapter from two separate Virtual IO Servers
Correct Answers:  A
 
4.A system administrator wants to control the HMC from their workstation.  Microsoft Windows 2000 is running and the HMC graphical user interface is being used remotely.  Which of the following actions will accomplish this task?
 
A: Use any Windows 2000 to graphically access the HMC
B: Load, install, and configure WebSM on the workstation
C: Telnet to the HMC using Exceed or a GUI emulator product from the workstation
D: Load, install, and configure OpenSSH or SSH on the workstation and access the HMC through the GUI interface
Correct Answers:  B
 
5.A customer has just installed a p5 595 with four uncapped LPARs in a shared processor pool.  The system and profile settings are still in their default states.  One of the LPARs has an application that is consuming all of the available shared processor resources.  Users of this application are complaining about response time.  Which of the following changes to the slow LPAR would improve response time?
 
A: Enable SMT
B: Reduce the weight
C: Renice the process
D: Increase the weight
Correct Answers:  D
 
6.During the Solution Assurance for a p5 590, a customer states there is a plan to install OEM Emulex cards in the p5 590.  The customer assumes there will be no problem with the plan since IBM resells the Emulex cards.  What is the correct response for the customer?
 
A: The IBM CE will install the card
B: The card will not be supported by IBM
C: The AIX device driver should work fine
D: The customer is correct, there should be no problem
Correct Answers:  B
 
7.A customer wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?
 
A: VIO Server
B: AIX 5.2 ML4
C: Shared Ethernet Adapter
D: AIX 5.3 with Advanced Power Virtualization
Correct Answers:  D
 
8.A customer has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse.  They are interested in implementing Advanced Power Virtualization features particularly Virtual IO.  What is the best way to proceed?
 
A: Upgrade the p690 to a p5 590 server running AIX 5.3
B: Upgrade the p690 server to AIX 5.3 and implement Advanced Power Virtualization
C: Purchase a p5 590 with minimum resources and simply reuse the p690 unused fiber HBA adapters
D: Purchase a p5 590 that has all the needed resources and adapters for Advanced Power Virtualization
Correct Answers:  D
 
9.In addition to the partition profile backup, how should the HMC be backed up to provide bare-metal restore capabilities?
 
A: Backup critical console data
B: Backup a bootable image to tape
C: Create mksysb image and store on a NIM server
D: Create mksysb image and store on an NFS server
Correct Answers:  A
 
10.A customer has a system running AIX 5.2 and wants to upgrade to AIX 5.3.  What method would provide the quickest recovery if the upgrade failed?
 
A: Use alt_disk_install
B: Backup image to NIM server
C: Backup using mksysb to DVD-RAM
D: Apply the upgrade and do not commit
Correct Answers:  A


责任编辑:admin 文章作者:
 
最新热点 最新推荐 相关文章
·Cisco试题库:ccna最新真题(下)(1)-Cisco认
·CCNA,CCNP考试界面
·微软MCITP 70-431 认证考试考题
·CISCO出版认证书籍详细介绍
·OracleDBA创建数据库试题精选-Oracle认证考
·Cisco试题库:ccna最新真题(下)(3)-Cisco认
·CCNP学习考试心得
·OracleDBA存储管理试题选-Oracle认证考试
·MCSE--微软认证系统工程师-(一)-Microso
·Cisco试题库:ccna最新真题(下)(4)-Cisco认
·主流CCNA实验模拟器介绍(2004版)
·CCNA教程之七层模型详解
·安装配置——路由器的硬件连接一(组图) 

·EMC e20-095 认证考试题
·EMC e20-580 认证试题
·EMC E20-535认证考试试题
·EMC E20-860 认证考试试题
·EMC E20-870 认证考题
·Nortel 920-139 考试题库
·Nortel 920-140 考试题库
·Nortel 920-158 考试题库
·Nortel 920-161 考试题库
·Nortel 920-162 考试题库
·思科 646-561
·思科 642-564
·思科 642-567

中搜索
IBM 000-180 考试题库
中搜索
IBM 000-180 考试题库
中搜索
IBM 000-180 考试题库
中搜索
IBM 000-180 考试题库
中搜索
IBM 000-180 考试题库
中搜索
IBM 000-180 考试题库
其他认证试题
SUN认证考试  SUN认证资讯
HP认证考试
ibm认证考试
Oracle认证考试  Oracle经验交流  Oracle综合辅导  Oracle试题库  应用技术辅导  报考指南  Oracle资讯
思科认证考试  Cisco认证报考指南  Cisco认证心得体会  思科认证试题  Cisco认证综合指导  思科CCIE认证考试  思科CCNP认证考试  思科CCNA认证考试  思科认证考试动态
微软认证考试  微软认证试题  microsoft认证模拟试题  microsoft认证历年真题  Microsoft认证心得技巧  Microsoft综合辅导  微软认证考试辅导  微软认证MCSD指导  微软认证MCAD指导  微软认证MCT指导  微软认证MCDBA指导  微软认证MCSA指导  微软认证MCDST指导  微软认证MCP指导  微软认证MCSE指导  Microsoft认证报考指南  微软认证考试动态
设为首页 关于我们 广告服务 联系我们 网站地图 加入收藏 网站声明 友情链接 考试认证论坛 意见反馈
Copyright©2007-2008 www.mbsexam.com All Rights Reserved.