1.How does order planning differ from the planning worksheet? A:Order planning does not consider order parameters from item cards or SKU cards.B:Order planning considers forecasts.C:Order planning examines one level of BOM structure at a time.D:There is no difference between the two processes.Correct Answers: A, C 2.If a work center is using a consolidated calendar, which of the following statements is true? A: The capacity of each machine center is equal to the capacity of the work center.B: No operations can be scheduled for the work center.C: Only outside operations can be scheduled for the machine centers.D: The work center capacity is equal to the sum of the machine center capacities.Correct Answers: D 3.In Microsoft Navision, a location code will automatically be transferred in: A:Planning worksheetB:Item journalC:Item ledger entry if postedD:RoutingCorrect Answers: A, C 4.A work center is using a consolidated calendar. The consolidated calendar consists of two machine centers. The capacities of the machine centers are 25 and 40 Hours. The efficiency of each machine center is 90%. What is the availability of the work center, when the queue time is one hour? A: 58 hours 30 minutesB: 59 hours 30 minutesC: 57 hours 30 minutesD: 65 hoursCorrect Answers: A 5.You have set up all of the components to forward flush, and there are no routing link codes in the production BOM. During which activity are the expected components consumed from inventory? A: When the production order status is changed to released.B: When you post the consumption journal.C: When you post the first operation in the output journal.D: When you click the Functions button and then click Explode Routing in the output journal.Correct Answers: A 6.How can you plan for the scrap of one component of a finished good? A: Add the amount of scrap to the quantity picked using the appropriate line on the consumption journal.B: Use the Scrap % field in the Production BOM line table.C: Add Scrap % to the routing of the released production order.D: Click the Routing menu item in the Released Production Order window and enter a value in the Scrap % field.Correct Answers: B 7.Microsoft Navision supports different reordering policies. Select the correct combination of reordering parameters. A: Fixed Reorder Quantity policy and Reorder QuantityB: Maximum Quantity policy and Order MultipleC: Order policy and Order MultipleD: Lot-for-Lot policy and Reorder PointCorrect Answers: A 8.For this question, assume that order tracking is used. When production orders are created from sales orders (M-T-O), a reservation between the two orders is invoked. Specifically, the program creates an order-to-order binding reservation. Various messages are generated by the program when "on the fly" changes are made to due dates and quantities. Select the message(s) that the program will display when we make the following changes: Change the production order completion date to before the sales order due date Change the sales order due date to after the production order due date Change the sales order quantity to less than the original quantity A: No messages are received.B: The order tracking entries for this line have a date conflict.C: The Sales Order Planning window indicates that replanning is required.D: The order tracking entries for this line have a quantity conflict.Correct Answers: A 9.You have 200 PCS on inventory, sales forecast of 100 PCS and an actual sale for 50 PCS in the forecast period. What will the ATP be? A: 50 PCSB: 100 PCSC: 150 PCSD: 200 PCSCorrect Answers: C 10.What is the purpose of the Calculation Formula field? A: To rapidly copy a new Production BOM from an existing oneB: To enter the quantity per assembly in terms of dimensionsC: To calculate cost standards for a parent from a collection of componentsD: To facilitate a unit of measure conversionCorrect Answers: B